Canada
Built for concrete subs. Runs in cubic metres.
Pick Canada in Control Panel ▸ Cross-Hub Options and everything follows: postal codes, °C and millimetres on every site’s 14-day forecast, cubic metres and MPa on every pour, square metres on every slab — the same pour board, crew planner and daily reports, with your whole crew free as viewers.
Country
Pick Canada once. The units follow.
Set the workspace country to Canada in the Control Panel and the defaults switch: postal codes in the Canada Post format, provinces instead of states, Celsius, kilometres per hour and millimetres for weather, cubic metres and MPa for concrete. Units can be pinned either way if a border crew prefers Fahrenheit, and every project carries its own country — so a US company runs a Canadian job in metric without touching anything else.
Weather
The forecast on every site, in °C and millimetres.
Type the postal code and the site geocodes itself. Every project gets a rolling 14-day forecast where the go/no-go is made, with highs and lows in Celsius and rain in millimetres, and the heat and cold thresholds read the same way. CSA A23.1’s cold-weather provisions are your spec; the forecast on the pour is where you see them coming, at the desk on Thursday instead of at the plant at 5 AM.
The pour
Cubic metres and MPa on the pill, m² on the slab.
Every pour card carries its volume in m³ and its mix in MPa, slab areas in m², and the board rolls cubic metres up by day, week and region. One click still confirms, moves or cancels the pour and tells the plant, pump, GC, PM and crew. Labor productivity reads in man-hours per cubic metre — entered per m³, never a converted per-yard number.
Overtime
Overtime the way your province counts it.
Three overtime modes. Auto-40 moves straight hours past 40 in the week into overtime — Quebec’s 40-hour standard. California 8-hour is over 8 a day at time-and-a-half, over 12 at double time, with the 40-hour weekly backstop — the same shape as British Columbia’s rules. Ontario’s 44-hour week and Alberta’s 8-a-day-or-44-a-week run in Manual: the office types ST, OT and DT the way the province counts them. Confirm the thresholds against your provincial employment standards; the mode decides which bucket an hour lands in, your payroll applies the rate.
Statutory holidays
Canada Day, the October Thanksgiving, and your province’s days.
US federal holidays come preloaded. Add Canada Day, Thanksgiving in October, Remembrance Day and the provincial statutory days as custom holidays; they show on the timesheet as HOL at your standard day when you pay them, and they stay out of the overtime math.
Payroll
Files for ADP and QuickBooks — and a CSV for the rest.
One-click exports built to each system’s import spec: ADP Workforce Now, ADP RUN, QuickBooks Online and Desktop, Paychex, Gusto, Paylocity, Sage, Vista, Foundation — plus a Universal CSV and a branded Excel timesheet, with your own earn codes, for anything else.
Notices
Email everywhere. Texts are US-only.
Confirm, move or cancel a pour and the notice reaches the plant, the pump operator, the GC, the PM and the crew by email in Canada exactly as in the US. Text alerts run on a US number under US carrier rules and are switched off outside the US, so a Canadian workspace is email-first — and the crew reads the live board on the free viewer login or the Planning Ops for iPhone and iPad.
Language
English and Spanish today. French is not here yet.
Foremen can file the daily report in English or Spanish; the office and the GC read it in English (typed notes stay as written). There is no French interface today. If French would decide it for your crew, tell us — it shapes the roadmap.
Pricing and hosting
US dollars, US servers, Canadian workspaces.
Planning Ops is a US company, billed by card in US dollars — $149/mo flat, 3 working seats, unlimited free viewers, extra seats $20/seat — and your bank does the conversion. Data is hosted in the United States on AWS (us-east-1) and backed up daily. Full pricing →
Canada — common questions
Does Planning Ops work in Canada?
Does it use cubic metres and MPa, or convert from yards?
Do Canadian postal codes work for the weather?
How does overtime work for Ontario, BC, Alberta or Quebec?
Can I add Canadian statutory holidays?
Which Canadian payroll systems can it export to?
Is it available in French?
What currency is it billed in, and where is the data hosted?
Run next week’s pours in cubic metres.
Pick Canada in the Control Panel, put one project on the board, and let the forecast and the notices do the rest.
14-day free trial · no charge until day 15 · cancel anytime